South Florida service · Licensed & Insured
BATHROOM REMODELING
Spa-level primary suites to hardworking guest baths — waterproofed, tiled, and finished right.
A bathroom is the most technically dense room in the house — waterproofing, slope, plumbing, ventilation, and tile all have to be right before it can be beautiful. Donovan Remodeling builds bathrooms across South Florida with that order of operations.
From a powder-room refresh to a full primary suite with a curbless shower and freestanding tub, we handle demolition, rough-in, waterproofing, tile, glass, and fixtures as one continuous scope.

Scope of work
What bathroom remodeling includes
- Complete bathroom renovations
- Walk-in and curbless showers with linear drains
- Freestanding and built-in bathtubs
- Primary-suite bathroom transformations
- Guest bathrooms and powder rooms
- Custom vanities and double-vanity configurations
- Floor and wall tile, including large-format and mosaic
- Frameless shower glass measurement and installation
- Full waterproofing systems behind every wet area
- Accessible and aging-in-place bathrooms
MATERIALS WE WORK WITH
- Porcelain and marble-look large-format tile
- Solid-surface and quartz vanity tops
- Brushed brass, matte black, and polished nickel fittings
- Backlit mirrors and moisture-rated lighting
Built for this climate
South Florida considerations
What changes when this work happens between Homestead and West Palm Beach.
Humidity is relentless here — we size ventilation properly and use moisture-rated boards and membranes behind every wet wall, not just the shower.
Bathroom remodels involving plumbing changes require permits in local jurisdictions; inspections of the rough-in and waterproofing stages are part of our schedule, not an interruption to it.
In condo towers, wet-area rules and stacking restrictions can limit where fixtures may move; we verify with the association before the design is final.
Before & after
See the distance we cover
Drag the divider, or use the arrow keys.
BeforeAfterGallery
Bathroom Remodeling — a closer look
Real field photography and design studies of the finishes we build. Items marked “Our work” are genuine Donovan Remodeling jobsite photos.
How it runs
Consultation to closed permit, in eight documented stages
Every project follows the same disciplined arc: consultation, site evaluation, design, written scope, permitting, construction, quality review, and a proper handover.
FAQ
Bathroom Remodeling questions, answered
The bathroom itself is out of service for the duration of its remodel — there's no honest way around that. What we control is the schedule: materials are on site before demolition starts, trades are sequenced back-to-back, and if it's your only bathroom we plan the project timeline with you in advance.
Yes, tub-to-shower conversions are one of our most common projects. The work includes reworking the drain and valve, building and waterproofing the new pan and walls, tile, and glass — and it usually requires a plumbing permit, which we handle.
A continuous waterproof membrane system — pan, curb or curbless slope, wall membrane, and sealed penetrations — installed and flood-tested before any tile goes on. Tile and grout are decorative; the membrane is what keeps water out of your walls.
Next step
Planning bathroom remodeling?
Tell us about the project and your ZIP code — we'll follow up to schedule a consultation.
