Open 24/7Serving South Florida from Homestead to West Palm Beach
DONOVAN REMODELING

South Florida service

BATHROOM REMODELING

A bathroom is the most technically dense room in the house — waterproofing, slope, plumbing, ventilation, and tile all have to be right before it can be beautiful. Donovan Remodeling builds bathrooms across South Florida with that order of operations.

From a powder-room refresh to a full primary suite with a curbless shower and freestanding tub, we handle demolition, rough-in, waterproofing, tile, glass, and fixtures as one continuous scope.

Scope of work

What bathroom remodeling includes

  • Complete bathroom renovations
  • Walk-in and curbless showers with linear drains
  • Freestanding and built-in bathtubs
  • Primary-suite bathroom transformations
  • Guest bathrooms and powder rooms
  • Custom vanities and double-vanity configurations
  • Floor and wall tile, including large-format and mosaic
  • Frameless shower glass measurement and installation
  • Full waterproofing systems behind every wet area
  • Accessible and aging-in-place bathrooms

MATERIALS WE WORK WITH

  • Porcelain and marble-look large-format tile
  • Solid-surface and quartz vanity tops
  • Brushed brass, matte black, and polished nickel fittings
  • Backlit mirrors and moisture-rated lighting

Built for this climate

South Florida considerations

What changes when this work happens between Homestead and West Palm Beach.

  • Humidity is relentless here — we size ventilation properly and use moisture-rated boards and membranes behind every wet wall, not just the shower.

  • Bathroom remodels involving plumbing changes require permits in local jurisdictions; inspections of the rough-in and waterproofing stages are part of our schedule, not an interruption to it.

  • In condo towers, wet-area rules and stacking restrictions can limit where fixtures may move; we verify with the association before the design is final.

How it runs

Consultation to closed permit, in eight documented stages

Every project follows the same disciplined arc: consultation, site evaluation, design, written scope, permitting, construction, quality review, and a proper handover.

FAQ

Bathroom Remodeling questions, answered

The bathroom itself is out of service for the duration of its remodel — there's no honest way around that. What we control is the schedule: materials are on site before demolition starts, trades are sequenced back-to-back, and if it's your only bathroom we plan the project timeline with you in advance.

Next step

Planning bathroom remodeling?

Tell us about the project and your ZIP code — we'll follow up to schedule a consultation.

REQUEST AN ESTIMATE

5 digits, e.g. 33134

Preferred contact method (optional)

Request an Estimate